DIRECTIONS FOR PRODUCT USE:
INITIAL APPLICATION
- Remove all old wax and floor finish with appropriate stripper.
- Rinse the floor thoroughly (at least twice) with clean water.
- Repeat steps 1-2 if all old finish is not removed. Allow floor to dry.
- Apply 3-4 thin coats using a clean synthetic mop, allowing a minimum of 30 minutes between coats.
- Apply additional coats in same manner, allowing at least 30 minutes drying time between coats.
- For very porous floors, an initial coat of floor sealer is recommended.
NOTE: Temperature, humidity and air movement affect curing time. To avoid contamination, do not return any used material to original container.
ROUTINE MAINTENANCE
- Sweep or dust mop as necessary.
- Damp mop with proper cleaner following label instructions. For accumulated soil, lightly scrub as needed.
- After cleaning, spray buffing or burnishing may also be done once loose dirt and dust has been swept up.
- Additional coats may be applied if needed.